Thursday, November 10, 2005

Wednesday, November 02, 2005

2005 11 02 Additional Sitework


The sign is visible from the street.


This picture shows the DOT drain line which will need to be moved to avoid the hotel structure.




Drainage catch basins are being installed.



Notice the existing house structure is completely removed.



The last picture is the subcontractor's equipment and materials on-site. Anticipate pouring concrete footings next week.