N Conway Hampton Inn & Suites
Thursday, November 10, 2005
2005 11 09 Concrete Footings
Pouring Concrete Footings!
Wednesday, November 02, 2005
2005 11 02 Additional Sitework
The sign is visible from the street.
This picture shows the DOT drain line which will need to be moved to avoid the hotel structure.
Drainage catch basins are being installed.
Notice the existing house structure is completely removed.
The last picture is the subcontractor's equipment and materials on-site. Anticipate pouring concrete footings next week.