![](http://photos1.blogger.com/blogger/7732/1804/320/02%20Street%20View.jpg)
The sign is visible from the street.
![](http://photos1.blogger.com/blogger/7732/1804/320/04%20DOT%20Pipes%20to%20Retention%20Pond.jpg)
This picture shows the DOT drain line which will need to be moved to avoid the hotel structure.
![](http://photos1.blogger.com/blogger/7732/1804/320/03%20Drainage%20Installed.jpg)
Drainage catch basins are being installed.
![](http://photos1.blogger.com/blogger/7732/1804/320/01%20House%20Gone.jpg)
Notice the existing house structure is completely removed.
![](http://photos1.blogger.com/blogger/7732/1804/320/05%20Sitework%20Material.jpg)
The last picture is the subcontractor's equipment and materials on-site. Anticipate pouring concrete footings next week.